Development of a Study Protocol for a RWE study (retrospective study design)

€24,000.00

Development of a Study Protocol for a retrospective RWE database study.

Included:

  • Kick-off meeting

  • Draft protocol

  • 1 workshop to discuss draft protocol

  • 2 review rounds; if no widely known database is used, client provides detailed information about available data in the database


Timeline: 8 weeks

Add To Cart

Development of a Study Protocol for a retrospective RWE database study.

Included:

  • Kick-off meeting

  • Draft protocol

  • 1 workshop to discuss draft protocol

  • 2 review rounds; if no widely known database is used, client provides detailed information about available data in the database


Timeline: 8 weeks

Development of a Study Protocol for a retrospective RWE database study.

Included:

  • Kick-off meeting

  • Draft protocol

  • 1 workshop to discuss draft protocol

  • 2 review rounds; if no widely known database is used, client provides detailed information about available data in the database


Timeline: 8 weeks

Database feasibility assessment
€75,000.00
Review of an existing RWE study protocol
€6,500.00
Review of licensed data assets
€64,000.00
Review of an existing RWE study SAP
€6,500.00
Feasibility of a GER claims Data study (such as FDZ)
€15,000.00