Database feasibility assessment

€75,000.00

Systematic web & literature search and targeted survey to identify suitable databases.

Included:

  • Web search and development of a survey for potential databases

  • Implementation of email-based survey of a MAX of 5 target databases per country, includes up to 5 countries

  • 20-30 page ppt of the results

Timeline: 8-12 weeks

Add To Cart

Systematic web & literature search and targeted survey to identify suitable databases.

Included:

  • Web search and development of a survey for potential databases

  • Implementation of email-based survey of a MAX of 5 target databases per country, includes up to 5 countries

  • 20-30 page ppt of the results

Timeline: 8-12 weeks

Systematic web & literature search and targeted survey to identify suitable databases.

Included:

  • Web search and development of a survey for potential databases

  • Implementation of email-based survey of a MAX of 5 target databases per country, includes up to 5 countries

  • 20-30 page ppt of the results

Timeline: 8-12 weeks

Feasibility of a GER claims Data study (such as FDZ)
€15,000.00
Feasibility of a GER Linked Data study
€25,000.00
Development of a SAP for a RWE study (retrospective study design)
€29,000.00
Development of a full-text manuscript for a RWE study
€27,000.00
Development of a Study Protocol for a RWE study (retrospective study design)
€24,000.00